Small Hydropower Plant Thermorema

Partly sedimented water intake during flood

Drained grit chamber with accumulated sediments

Country: Greece

Project period: 07/2009 - 10/2010

Client: Private Investor

Investment amount: EUR 48,000 (consulting)

Description:

The existing SHPP with 2.7 MW shows several deficencies in operation:

  • Flushing of grit chamber is not efficent and accumulated sediments must be removed by hand;
  • Flow velocities in grit chamber are partly too high to allow sand to settle;
  • Tyrolean weir at the intake is regulary blocked by sediments after flood events;
  • Algae problem due to surface water inflow just upstream intake;
  • Land slide at the penstock section.

The aim of the project is to analyse the current situation and to design the details for improvement measures to optimize the plant operation.

A SCADA system shall be installed to allow state-of-the-art operation and monitoring of the power plant.


Services provided:
  • Analysis of present operational problems
  • Detailed design of improvement measures
  • Detailed design of SCADA system
  • Detailed design of automated flushing system for grit chamber