Small Towns Infrastructure and Capacity Building

Country: Kyrgyz Republic

Project period: 04/2004 - 04/2005

Client: ARIS, The World Bank

Investment amount: USD 200,000

Description:

The project included the assessment of the existing infrastructure for urban water and sanitation system of 7 selected towns with a total population of about 320,000. To upgrade existing systems the most economic and efficient measures within an emergency investment program for the subsequent period of about 4 years were specified.


Services provided:
  • Assessment of existing water supply infrastructure
  • Assessment of existing waste water infrastructure
  • Identification of priority measures
  • Preparation of TOR for services, works and supplies