Extension of the Waste Water Treatment Plant Braunau

Country: Austria

Project period: 06/2001 - 12/2003

Client: Waste Water Association Braunau, Municipality of Braunau

Investment amount: EUR 210,000

Description:

The existing plant, designed for a capacity of 30,000 PE, was extended to a capacity of 60,000 PE, with full enhanced biological nutrient removal. In order to allow the use of existing tank volume the LINDPORR C process combined with the biological side stream process PHOSTRIP were applied. The project included detailed design, procurement, construction supervision and start-up of the plant.


Services provided:
  • Process layout
  • Detailed design
  • Start-up