Mazeikiai Wastewater Treatment and Water Supply
Country: Lithuania
The specific objective of the project is to improve the standard of the water sector in the town of Mazeikiai, Lithuania’s eighth largest city, and bring it to EU levels. The major investment shall be the new construction of a wastewater treatment plant (WWTP) to treat the city’s wastewater. Since the financial ceiling for this ISPA project is preliminarily limited with approx. EUR 5.8 million, additional measures in the sewage collection system and/or in the water distribution network will receive limited ISPA support. Hence, in order to optimise resources and impacts a 20-year “Water Sector Masterplan” will be an integral part of the “Feasibility Study”. It will be divided into short (0-4 years), medium (5-9 years) and long-term (10-20 years) investment plans. The project proposed for ISPA support shall belong to the short-term investment programme.
- Preparation of feasibility study
- Preparation of EIA
- Preparation of ISPA application
- Preparation of TORs for further stages of the project