Rehabilitation of Batllava Pumping Station

Country: Kosovo

Project period: 01/2001 - 12/2003

Client: European Agency for Reconstruction (EAR), EU-CARDS

Investment amount: EUR 1,500,000

Description:

Batllava Pumping Station supplied 80% of the Population of Pristina, (400.000 p.e.) with a capacity of 1000l/s at a rated power consumption of 1.5 MW. The project included a feasibility study, detailed design, preparation of tender documents and tender evaluation according to PRAG for the rehabilitation of the pumping station.


Services provided:
  • Assessment of existing structure and equipment
  • Elaboration of 3 alternatives for reconstruction
  • Detail design of 3 new pumps, low voltage and high voltage equipment
  • Preparation of tender documents according to PRAG and tender evaluation