Water Supply Veliko Gradište, Site Supervision Contract

Country: Serbia

Project period: 08/2014 - 05/2017

Client: Austrian Development Agency

Investment amount: EUR 4.14 M

Description:

Under this project a new water supply system is to be constructed for the town of Veliko Gradiste, Serbia. The scope of this assignment is Construction Supervision and performing the duties of the Engineer according FIDIC and the duties and responsibilities of the technical Supervisor (strućni nadzor) according to the Planning and Construction Law of Serbia.

 

The works to be supervised comprise:

  • Rehabilitation of wells with capacities of 30l/s each
  • Construction of raw water pressure pipeline DN400
  • Water treatment Plant with 100l/s
  • Reservoir with 1,500 m³ capacity and pumping station at the WTP with capacity of 90l/s
  • Pressure pipeline up to the water tower – 2.5km DN400
  • Water tower “Beli Bagrem” with 1,200m³ volume and 54 m height.

All works have been tendered as a single FIDIC Design & Built Contract (Yellow Book) and total value of works is EUR 4.14M.


Services provided:
  • Overall project managementLiaison with the Client, Financier and all stakeholdersDesign review of the Contractor’s design Construction supervision according FIDIC Yellow Book
  • Assistance in training and commissioning
  • Advice the Financer and the Employer