Hydropower Plant Project KARURA

Country: Kenya

Project period: 09/2009 - 09/2010

Client: Kenya Electricity Generation Company Ltd.

Investment amount: EUR 350,000 (consulting only)

Description:

The client KenGen intends to increase its hydropower production capacity. The aim of this consulting assignment is to elaborate a Feasibility Study of the Karura hydropower project, which will exploit the residual head between the existing Kindaruma and Kiambere powerstations of the Tana River. Several alternatives must be studied and a recommendation for the most convenient option must be given. Expected power potential: 60 MW.


Services provided:
  • Dam engineering
  • Hydrology
  • Hydraulic engineering
  • Survey and reservoir silting
  • Electrical engineering
  • Hydropower-option study
  • Preliminary design
  • Feasibility study