Hydropower Plant Qukes

Country: Albania

Project period: 03/2008 - 09/2008

Client: Private Investor

Investment amount: EUR 110,000 (consulting)

Description:

The project includes the assessment of the feasible hydropower potential of a defined river section of Shkumbin river, to prepare a feasibility study for the hydropower cascade, to prepare a business plan and to assist the investor in preparing all relevant documents for obtaining the concession. The project includes a cascade of four hydropower stations with a total installed capacity of about 50 MW.


Services provided:
  • Assessment of feasible hydropower potential
  • Hydrological, topographical and ecological assessment and analysis
  • Preparation of feasibility study with financial analysis
  • Preparation of business plan
  • Compilation of proposal for obtaining the concession