Hydropower Plant Qukes
Country: Albania
Project period: 03/2008 - 09/2008
Client: Private Investor
Investment amount: EUR 110,000 (consulting)
Description:
The project includes the assessment of the feasible hydropower potential of a defined river section of Shkumbin river, to prepare a feasibility study for the hydropower cascade, to prepare a business plan and to assist the investor in preparing all relevant documents for obtaining the concession. The project includes a cascade of four hydropower stations with a total installed capacity of about 50 MW.
Services provided:
- Assessment of feasible hydropower potential
- Hydrological, topographical and ecological assessment and analysis
- Preparation of feasibility study with financial analysis
- Preparation of business plan
- Compilation of proposal for obtaining the concession

