Gas Pipeline, Austria - Bavaria
Country: Germany
Project period: 04/1995 - 10/1996
Client: Bayernwerke AG Beteiligungsgesellschaft
Investment amount: EUR 75,000,000
Description:
For the supply of natural gas from Austria to Bavaria, and for the utilization of the existing gas field Schnaitsee, a gas transmission system (60 km long) was implemented.
Services provided:
- General routing
- Detail design
- Surveying
- GIS applications.