Natural Gas Pipeline, RHG Rehden-Heidenau

Country: Germany

Project period: 1993 - 1994

Client: TEERBAU GmbH

Investment amount: EUR 120,000,000

Description:

To supply the city of Hamburg with natural gas a new pipeline, branching off at Rehden from the Midal pipeline, was constructed on a turnkey basis. The approx. 130 km long pipeline had a diameter of 800 mm and a maximum throughput capacity of 3.4 billion m³/year. The pipeline went into operation in middle of 1994.


Services provided:
  • Planning and detailed design for all gas stations and crossings
  • Static calculations
  • General technical assistance to the turn-key contractor
  • Computer based as-built documentation.