Natural Gas Pipeline, RHG Rehden-Heidenau
Country: Germany
Project period: 1993 - 1994
Client: TEERBAU GmbH
Investment amount: EUR 120,000,000
Description:
To supply the city of Hamburg with natural gas a new pipeline, branching off at Rehden from the Midal pipeline, was constructed on a turnkey basis. The approx. 130 km long pipeline had a diameter of 800 mm and a maximum throughput capacity of 3.4 billion m³/year. The pipeline went into operation in middle of 1994.
Services provided:
- Planning and detailed design for all gas stations and crossings
- Static calculations
- General technical assistance to the turn-key contractor
- Computer based as-built documentation.