Rehabilitation of Municipal Infrastructure in Batumi -Phase II
Country: Georgia
The project is the second out of three project phases, formulated in the feasibility study prepared by our company in 2005/2006. This Phase foresees investments for a total of 50. Mio EURO and covers the following investments for the city of Batumi:
Rehabilitation (exchange) of 100 km of drinking water pipelines, rehabilitation of 50 km of sewers, construction of a new WWTP for 200.000 PE including a 3.6 km sea outfall into the black sea. For all above investments project management, detailed design, procurement and construction supervision as well as assistance to the PEA (project implementation agency) is provided.
In addition the project includes the implementation of a wastewater disposal system for the Adjara coastal strip between the Turkish border and Batumi, which is the main focus area of tourism development in the region. These measures cover investments into a pumping sewer line of 17 km length (by 4 pumping stations) and secondary sewers for all settlements (5 villages with in total 10.000 inh.) along the coastline (100 km of secondary sewers incl. house connections). Also for these investments project management, detailed design, procurement and construction supervision is provided.
- Overall Project Management
- Procurement
- Detailed design
- Hydraulic modelling
- Dilution modelling for sea outfall design
- Leak detection, developing concepts for reduction of UFW
- Construction Supervision
- Assistance to PEA