Waste Water Treatment Plant Wallern
Country: Austria
Project period: 11/1999 - 12/2001
Client: Waste Water Association Braunau
Investment amount: EUR 190,000
Description:
The existing 25,000 PE WWTP designed for carbon removal and nitrification was extended to allow denitrification and enhanced biological P removal for a maximum design load of 50,000 PE. Additionally the excess sludge line was extended by an additional digester and dewatering equipment.
Services provided:
- Process layout
- General design
- Detailed design for enhanced biological P removal
- Preparation of Tender Documents
- Construction supervision
- Start-up