Wastewater Treatment Plant Schalchen

Country: Austria

Project period: 1994 - 1996

Client: RHV, Reinhalteverband

Investment amount: EUR 15,000,000

Description:

Construction of a 75,000 PE wastewater treatment plant with enhanced Phosphorus and Nitrogen removal. Application of modified Phostrip II process with Phosporus recovery combined with side stream denitrification and ammoniac stripping.


Services provided:
  • Preparation, monitoring and commissioning of a pilot study
  • General design of ammoniac stripping plant
  • Detail design of Phostrip process.
  • Preparation of tender documents
  • Construction supervision
  • Process optimisation