Wastewater Treatment Plant Eberstadt

Country: Germany

Project period: 1989 - 1992

Client: Südhessische Gas und Wasser AG

Investment amount: EUR 12,000,000

Description:

As the technology and capacity of the wastewater treatment plant in Eberstadt was no longer able to cope with the requirements, the complete new construction of a 50,000 EGW-plant was planned. Eberstadt was the first plant in Germany equipped with the Phostrip-process for biological phosphorous elimination. Phostrip is a patented side stream process which allows the biological degrading of phosphates to the required level without any additional precipitation in the wastewater.


Services provided:
  • License Phostrip-process
  • Detailed design
  • Procurement assistance
  • Construction supervision
  • Start-up assistance
  • Training of personnel