Extension Wastewater Treatment Plant Wallern
Country: Austria
Project period: 1998 - 2000
Client: Reinhaltungsverband Trattnachtal
Investment amount: EUR 5,000,000
Description:
Extensions of the waste water treatment plant from 40,000 PE to 70,000 PE. Therefore the following measures were carried out: Rising of water level in activation intermediate pumping station, new sand trap, stripper and pre-stripper for biological P-removal, new digester, sludge dewatering, 2 bio-heating plants.
Services provided:
- General design
- Detailed design
- Tendering
- Construction supervision for Phostrip plant