Preparation of technical documentation and a management set-up for the Regional Water Supply System Lička Jasenica-Plitvička Jezera-Slunj
Country: Croatia
Project period: 06/2007 - 01/2009
Client: Government of Croatia, European Commission
Investment amount: EUR 16.23 million
Description:
The overall objective was to ensure safe, reliable and sustainable water supply services in the project area, which covered five municipalities and the National Park "Plitvicka Jezera". Future investments in the water supply and wastewater collection and treatment system were identified and a feasibility study, detailed design and tender documents were produced for the required works. The Institutional setup for an operating company was also established, including a model performance contract, and an economic and financial analysis and tariff calculations were carried out to ensure future sustainable operation.
Services provided:
- Identification of future investments
- Detailed design
- Preparation of tender documents
- Institutional setup
- Financial analysis
- Tariff calculations