Supervision of the Development Infrastructure Work in Sibenik-Knin and Zadar Counties - II

Country: Croatia

Project period: 11/2005 - 11/2006

Client: Delegation of the European Commission to Republic of Croatia, EU-CARDS

Investment amount: EUR 3,400,000

Description:

The project comprises full supervisory services of 5 smaller municipal infrastructure projects with a total investment volume of EUR 3.4 million. The task was performing the functions and duties of the “Supervisor” according to FIDIC conditions of contract and EU procedures. The services included administration and supervision of the various works contract, set-up of the necessary organisation to ensure efficient administration and satisfactory completion of the works, to ensure timely implementation and efficient use of financial resources.

Short summary of the 5 sub-projects:

Kistanje water supply: replacement of a damaged transmission main from Kistanje to Macure Pumping Station incl. construction of a 1,800m long DN300 and a 3,400m DN250 main.

Skabrnja – Zemunik Water Supply: construction of appox. 1,300m DN400 and 11,700m DN80-400 water distribution network.

Marici channel: reconstruction of the Marici drainage channel of approx. 1,645m

Podi Business Zone: construction of roads and all services for the first 20 ha of a business zone in Podi, including approx. 1.4 km of roads, 2.5 km water distribution system, 2.2 km wastewater sewer and a package treatment plant, 3 km of rainwater drainage system with oil separator, 2.7 km electricity cable network incl. 4 transformers and street lighting system with 76 lighting poles.

Mandalina Office complex – refurbishment of the former “Remont” complex to provide office facilities.


Services provided:
  • Heading a team of engineers for construction works supervision according to FIDIC and EU procedures.