Supervision of the Development Infrastructure Work in Sibenik-Knin and Zadar Counties - I

Country: Croatia

Project period: 05/2005 - 08/2006

Client: Delegation of the European Commission to Republic of Croatia. EU-CARDS

Investment amount: EUR 2,300,000

Description:

The project comprises full supervisory services of 5 smaller municipal infrastructure projects with a total investment volume of EUR 2.3 million. The task was performing the functions and duties of the “Supervisor” according to FIDIC conditions of contract and EU procedures. The services included administration and supervision of the various works contract, set-up of the necessary organisation to ensure efficient administration and satisfactory completion of the works, to ensure timely implementation and efficient use of financial resources.

Short summary of the 5 sub-projects:

Lisičić Water Supply: High density polyethylene (HDPE) water transmission main approximately 1.3km of 355mm dia, 2.1km of 315mm dia. in a existing partially excavated trench, completion of a booster pumping station including all mechanical and electrical equipment.

Podgradina Water Supply: 150mm dia. HDPE transmission main approximately 3.3km long and a 250 cu.m. reinforced concrete reservoir and access road approximately 230m long.

Skradin Wastewater system: construction of a wastewater pumping station (output 15-17l/sec), 180mm dia. HDPE pumping main approximately 0.46km long and wastewater treatment plant (based on the activated sludge process) and 200mm dia. HDPE effluent pipe approximately 1.0km long, to serve a population equivalent of 2,600.

Piramatovci Water Supply: Water distribution system approximately 4.4 km of pipelines (1” – 250mm dia.)

Promina Water Supply: 125mm dia. HDPE distribution main approximately 10km long to serve the villages of Matase, Zelići and Marasovine.


Services provided:
  • Heading a team of engineers for construction works supervision according to FIDIC and EU procedures