Municipal Services
Country: Turkey
The aim of the project was the review of feasibility studies of water supply, waste water and solid waste projects in Turkey from an economic, technical, and environmental standpoint.
The Consultant had to ensure that the most economic option had been selected for investments, taking into account demand projections and affordability of tariffs. Also, ensured that the technical solution proposed was feasible, that the environmental benefits, as estimated in the feasibility study, were realistic and checked the validity of the financial analyses made in the reports.
A further task was the preparation of a list of the investments on a priority basis, which was established according to international standards and with close cooperation with the World Bank and the Iller Bank.
- Economic Assessment
- Verification of Technical Solutions
- Environmental Impact Assessments
- Validation of Financial Analyses
- Identification of priority measures
- Presentation to the Bank