Small Hydropower Plant Bergbahn Lofer

Страна: Austria

Период проекта: 06/2009 - 08/2009

Заказчик: Private Investor

Сумма инвестиций: EIR 5,000

Описание:

The client operates an existing snow making system in the project area. The aim of the Pre-Feasibility Study was to design the technical options and evaluate and opine the technical and economical feasibility of the extension by a Small Hydropower Plant of the existing snow making system and introduce this project to the local authorities.


Оказанные услуги:
  • Design of technical options and construction works
  • Evaluate the technical and economical feasibility
  • Introduce the project to the local authorities